Preparation of Detailed Project Report (DPR) for Construction of road from Sherichhu to Gongrizomsa (35...

BHUTAN
2021-05-02 - 2022-11-22
Partner Not Available

The scope of work for preparation of Detailed Project Report shall include, but not limited to the following:

· Road Feasibility Study

· Environment Impact Assessment including Socio-Economic Analysis

· Site Study and Detailed Survey Works

· Geotechnical Assessment/Investigation

· Design of Road

· Conceptual Design of Bridges and other Structures

· Design of Bridge and other structures

· Technical Specifications (Specifications & Performance Requirements)

· Bill of Quantities

· Rate Analysis and Cost Estimate

· Preparation of Final Report